Enterprise Preventive Maintenance Schedules

Modified on Fri, Aug 30 at 4:40 PM

The Report Category Enterprise - CMMS is only available to Enterprise CMMS Customers


This report provides information about all of the PM Jobs and Schedules across all sites and can be found under the Enterprise - CMMS category from the left menu.


Below is a sample of what the report may look like:



You may customize your report by choosing which columns are shown and where by selecting the Configuration  in the top right. A quick tutorial is shown; for more help see Customizing Reports:



Finally, the chart below gives descriptions of all of the possible columns:


ColumnDescription
Site NameName of the site the PM Job belongs to.
PM Master StatusWhether the PM job is still active.
Master Job IDID for the PM job.
DescriptionDescription of the PM Job.
PM TypeType of PM. For more help viewing the options, see Lookup List Meanings & Descriptions.
Schedule TypeTrigger for the schedule (Calendar, Meter, or On Demand).
DurationExpected duration of maintenance.
Schedule Record StatusWhether the schedule is still active.
Charge TypeThis is always set to Asset
Charge To ID & NameID and name of the asset the Schedule Record is Charged To
Down RequiredIndicates if a Down is Required to perform the work
Last Scheduled / PerformedWhen the PM job was last scheduled or performed.
Last WOLast Work Order Number
Last WO StatusStatus of Last Work Order generated for this schedule record
WO Actual DurationActual duration of maintenance.
Schedule MethodWhether the schedule is based off of last due or last done (Calendar PMs only). See Last Due vs Last Done for more help.
Frequency & Frequency TypeUnit of measurement for calendar PMs (days, months, quarters, etc)
Calendar SlackNumber of days that may pass between when the PM was due and when it will be performed. See Calendar Slack for more help.
Next DueWhen the job is next due.
Meter IDID of the meter being used for the job (Meter PMs only)
Meter IntervalValue that the next meter reading must reach or exceed in order to trigger the PM into a work order.
Meter Last DueLast Due interval for Meter
On Demand GroupOn Demand Group assigned to the PM Schedule record. For more information see On Demand Groups
Assigned ToPersonnel that maintenance was/is assigned to.
PriorityPriority assigned to this Schedule record - for more help see Setting Up Lookup Lists
TypeType of PM - for more help see Setting Up Lookup Lists.
ShiftShift that the maintenance was/is performed during.



Was this article helpful?

That’s Great!

Thank you for your feedback

Sorry! We couldn't be helpful

Thank you for your feedback

Let us know how can we improve this article!

Select at least one of the reasons
CAPTCHA verification is required.

Feedback sent

We appreciate your effort and will try to fix the article